List Your Equipment  /  Dealer Login

INDOT Identifies First Project for Its Newest Alternative Delivery Model

Wed March 13, 2024 - Midwest Edition #6
Indiana Department of Transportation


INDOT graphic
   (INDOT graphic)    (INDOT graphic)    (INDOT graphic)

The Indiana Department of Transportation (INDOT) is providing advanced notice of the procurement of its first project to be delivered using the Construction Manager General Contractor (CMGC) delivery method.

The Interchange Modification Project for U.S. 31 and I-465 in Hamilton County includes the modification of the I-465/U.S. 31 north interchange; seven bridge deck overlays; and related work on U.S. 31 from I-465 to 116th Street in Carmel. The project will increase capacity for west to north and east to north movements to create better traffic flow and enhance safety.

INDOT anticipates beginning the procurement by issuing a Request for Proposals (RFP) in spring 2024. Information for prospective proposers will be available on the Doing Business with INDOT: Request for Proposals webpage.

A qualifications-based selection process will be used to award the CMGC contract. Selection will be based on INDOT's evaluation of proposals and interviews.

The CMGC delivery method includes two project phases, the preconstruction phase and the construction phase. INDOT encourages all contractors interested in the project to review the draft Alternative Delivery Manual and other information related to CMGC on the INDOT Alternative Delivery webpage.

CMGC is a delivery method in which design and construction are delivered under two separate agreements, one agreement with a professional services consultant (designer) and one agreement with a construction manager/general contractor (CMGC contractor). The designer performs preliminary engineering and develops a project design and specifications of the project. The CMGC contractor performs services under the preconstruction and construction phases.




Today's top stories

Make Eliminating Jobsite Distractions Company Safety Goal

Two Firms Give Burned Highway New Life

VIDEO: Komatsu Holds Demo Days at Cartersville Customer Center

ABC: Over Half of March State Construction Unemployment Rates Down From a Year Ago

Allen Engineering Hosts 60th Anniversary Celebration

Contractors' Plate Full On Interstate 35 in Texas

Space Coast Leaders, Residents Excited About Planned Brightline Rail Station in Cocoa

Attachments International Debuts Severe Service Demolition Grapple


 






aggregateequipmentguide-logo agriculturalequipmentguide-logo craneequipmentguide-logo forestryequipmentguide-logo truckandtrailerguide-logo
39.96250 \\ -83.00610 \\ Columbus \\ PA