List Your Equipment  /  Dealer Login

Bridge Opening Delayed After Parts of Old Tappan Zee Deemed Unstable

Mon September 10, 2018 - Northeast Edition
Emily Buenzle


Construction workers said they heard a loud “pop” from the old Tappan Zee Bridge around 5 p.m. in the evening on Sept. 7, a day before the new span of the Gov. Mario M. Cuomo Bridge was supposed to officially open, LoHud reported.
Construction workers said they heard a loud “pop” from the old Tappan Zee Bridge around 5 p.m. in the evening on Sept. 7, a day before the new span of the Gov. Mario M. Cuomo Bridge was supposed to officially open, LoHud reported.

The opening of the second span of the new Tappan Zee Bridge has been rescheduled for Sept. 11 after a piece of the old bridge became destabilized and almost fell on Sept. 7.

Construction workers said they heard a loud “pop” from the old Tappan Zee Bridge around 5 p.m. in the evening on Sept. 7, a day before the new span of the Gov. Mario M. Cuomo Bridge was supposed to officially open, LoHud reported. To find out what happened, contractors used drones to take pictures of the old bridge, which was in the process of being demolished. When engineers looked at the images, they found a problem with two of the joints on the east anchor span, said Tappan Zee Constructors President Terry Towle.

“It looks (like) one of the members of the old Tappan Zee, of the old structure itself, slipped in one of the joints,” said Towle. “During the disassembly, we found a difference in the two joints than the engineer assumed and that's what caused this problem.”

Towle chose to reschedule the new span's opening.

“We want to make sure this old bridge is absolutely safe out of abundance of caution before we proceed,” said Towle.

In a statement released Sept. 9, Tappan Zee Constructors said it has determined that the anchor span of the old Tappan Zee Bridge is damaged, but it is in stable condition, and does not pose a threat to the new span, the Associated Press reported.




Today's top stories

Eagle Bridge Co. Works On Final Leg of U.S. 35 Upgrade

Fay Preps Way for Pittsburgh International Airport Modernization Project

Volvo CE Continues to Perform, Transform During Slower Q1 2024

American Bridge Co. Leads Conn.'s East Haddam Swing Bridge Project

Pettibone Celebrates 75th Anniversary of Cary-Lift

Common Ground Alliance Hosts Conference & Expo in Colorado On Preventing Utility Damages

Going Beyond Diversity: Star Equipment's Rental Advantage

Volvo CE Launches Updated L30, L35 Compact Wheel Loaders


 






aggregateequipmentguide-logo agriculturalequipmentguide-logo craneequipmentguide-logo forestryequipmentguide-logo truckandtrailerguide-logo
39.96250 \\ -83.00610 \\ Columbus \\ PA