List Your Equipment  /  Dealer Login

'Centennial Bowl' Ramp Closes Forever in Northwest Las Vegas

Wed March 13, 2019 - West Edition #6
Nevada Department of Transportation


NDOT permanently closed the northbound U.S. Highway 95 to westbound 215 Beltway loop ramp for the next phase of Centennial Bowl construction.
(NDOT photo)
NDOT permanently closed the northbound U.S. Highway 95 to westbound 215 Beltway loop ramp for the next phase of Centennial Bowl construction. (NDOT photo)

The Nevada Department of Transportation (NDOT) permanently closed the northbound U.S. Highway 95 to westbound 215 Beltway loop ramp Feb. 5, in northwest Las Vegas. It's being demolished and rebuilt as a direct flyover ramp as part of the $73 million next phase of the Centennial Bowl, which broke ground in January. Las Vegas Paving is the general contractor.

The 75-ft.-tall by 39-ft.-wide concrete box girder structure will measure 2,635 ft. or the equivalent of seven football fields. The two-lane flyover bridge will connect north-to-west traffic, enabling direct freeway-to-freeway connections while still maintaining highway travel speeds for greater efficiency and safety. It will be the state's second longest bridge.

Meanwhile, alternate north-to-west freeway access will be clearly marked 1,000 ft. south of the old ramp. The detour will remain in place until construction of the new flyover bridge is complete in the fall of 2020.

Motorists should use caution while travelling through the work zone, heed construction signage, and take alternate detour routes, if possible. NDOT works with Waze to inform the public about planned highway restrictions, but unscheduled construction changes, closures and restrictions are possible due to weather or other factors. For the latest state highway conditions, visit nvroads.com or call 511 before driving.

For more information, visit nevadadot.com.




Today's top stories

New Bridges Part of Iowa's $114M Madison Avenue Project

Eagle Bridge Co. Works On Final Leg of U.S. 35 Upgrade

Fay Preps Way for Pittsburgh International Airport Modernization Project

SAKAI Achieves Record Sales, Production

Takeuchi Recognizes Top Dealers at 2024 Dealer Summit

Muddy Water Dredging Christens Marlin Class Dredge

Indiana Officials Mark Start of 2024 Construction Season, Promote Safety

Leica Geosystems Launches its First Machine Smart Antenna — Leica iCON gps 120


 






aggregateequipmentguide-logo agriculturalequipmentguide-logo craneequipmentguide-logo forestryequipmentguide-logo truckandtrailerguide-logo
39.96250 \\ -83.00610 \\ Columbus \\ PA