List Your Equipment  /  Dealer Login

GDOT Scraps Optional Toll Lanes Project

Fri December 23, 2011 - Southeast Edition
Construction Equipment Guide


ATLANTA (AP) The state Department of Transportation’s board has withdrawn a plan to add optional toll lanes alongside interstate highways in Cobb and Cherokee counties north of Atlanta.

The Atlanta Journal-Constitution reported board member Brandon Beach said Dec. 14 the department would look at other methods for building the billion-dollar project.

The project would have built two reversible toll lanes alongside Interstate Highway 75 from I-285 to I-575 and one reversible toll lane each along I-75 up to Hickory Grove Road and along I-575 up to Sixes Road.

The toll price was to fluctuate with congestion in the main lanes to keep the toll lane free-flowing. Unlike the HOT lane on I-85, it was to be financed and built by private companies, who would be repaid by toll revenues.




Today's top stories

Growing Interest in Construction Careers Among Younger People Means Jobs Filled, Deadlines Met

Larry Young Paving Tackles Grade-Separated Interchange in Texas

Caltrans, Crews Working to Repair Highway Landslides

FIRSTGREEN Industries Launches ROCKEAT Electric Skid Steer Loader

'Tiltrotator Effect' Increases as Energy Consumption Goes Down

VIDEO: Birmingham, Ala., Awarded $14.5M Fed Grant to Revitalize Its 'Black Main Street'

Pettibone Celebrates 75th Anniversary of Cary-Lift

Fay Preps Way for Pittsburgh International Airport Modernization Project








aggregateequipmentguide-logo agriculturalequipmentguide-logo craneequipmentguide-logo forestryequipmentguide-logo truckandtrailerguide-logo
39.96250 \\ -83.00610 \\ Columbus \\ PA