List Your Equipment  /  Dealer Login

I-30 Stretch SW of Benton Built Badly as Test Site

Fri January 07, 2011 - Southeast Edition
Construction Equipment Guide


BENTON, Ark. (AP) Highway officials say one of the worst stretches of pavement on an interstate highway in Arkansas fully meets specifications, because those specifications called for substandard construction methods and materials, to test their effects.

The section of westbound lanes is roughly between mile markers 108 and 110, south of I-30’s intersection with U.S. 70, southwest of Benton and just north of Saline County’s border with Hot Spring County, is among the most dilapidated parts of the interstate system in the state.

The Arkansas Democrat-Gazette reported that a dozen 500-ft. (152 m) sections in that stretch were designed and built as part of a national pavement-testing program that the federal government began in the late 1980s.

Modern design calls for at least 12 in. (30.5 cm) of surface concrete. The test sections have thicknesses ranging from 8 in. to 11 in. (20 to 28 cm). The bases on which the surfaces rest also fall short of standards, so the pavement would break down.

“Several times we’ve gotten heat from the public,” said Alan Meadors, who heads the planning and research division at the Arkansas Highway and Transportation Department. “Enough to make you wonder if you need to have your head examined for putting in these sections that are designed to fail.”

The deterioration of the test surfaces gave highway-construction engineers markers to use when looking at stronger-built road surfaces that fail at a slower rate.

“It’s been very exciting for me to see in a short period of time what usually takes years,” Meadors said.

The I-30 site is one of more than 2,000 in the nation that have been part of the Long-Term Pavement Performance program, which federal highway officials bill as the most comprehensive pavement research program ever undertaken.

Rachel Keesee and Robin Belt, engineers from Austin, Texas, are performing the tests as part of a contract their employer, Fugro Consultants, has with the Federal Highway Administration. The two engineers are taking measurements and collecting other data that will be fed into local and national databases for research.

Keesee said she has been testing such sites in an 11-state region for 11 years and knows them so well they are “almost like friends.”

Among the observations Keesee and Belt will be making are the differences between the level of one slab and another, using an instrument called a falling-weight deflectometer. It is accurate to within a thousandth of a millimeter, Meadors said. Over time, each slab can rise or fall, creating an uneven surface that generates thumping as vehicles pass over it.

The program grew out of a 1984 report from the Transportation Research Board that recommended long-range field tests to systematically measure and record a “wide range of climate, soil, construction, maintenance and loading conditions.”




Today's top stories

Shelly & Sands Aims to Relieve Congestion at 'The Point' in Ohio

Bizzack Construction Brings Innovation, Adaptability to Large Earthmoving Projects

ASV Bolsters Forestry, Construction, Landscaping, Snow Clearing Attachment Lineup

Rehabilitation of Quechee Gorge Bridge Under Way in Hartford, Vt.

AEM Welcomes 2024 Officers, New Directors at Annual Conference

Work to Soon Begin On 58-Story Residential Tower Along Jersey City's Waterfront

Ferronordic Acquires Volvo CE Dealer Rudd Equipment

Waterville, Maine's $35M Head of Falls Village Apartment Project to Launch in 2024








aggregateequipmentguide-logo agriculturalequipmentguide-logo craneequipmentguide-logo forestryequipmentguide-logo truckandtrailerguide-logo
39.04690 \\ -77.49030 \\ Ashburn \\ PA