List Your Equipment  /  Dealer Login

John Deere Adds 20,000-Hour Warranty on 944K Hybrid Wheel Loader Power Electronic Components

Wed April 26, 2017 - National Edition
John Deere


John Deere is now offering a 96-month (eight-year)/20,000-hour power electronic components warranty on the 944K hybrid wheel loader.
John Deere is now offering a 96-month (eight-year)/20,000-hour power electronic components warranty on the 944K hybrid wheel loader.

John Deere is now offering a 96-month (eight-year)/20,000-hour power electronic components warranty on the 944K hybrid wheel loader. The warranty is retroactive to existing machines in the field and provided on new 944K loaders through Oct. 31, 2018.

“We continue to build confidence in our hybrid technology and the high-design life of machine components,” said Jason Daly, director, customer and product support, John Deere Construction & Forestry. “As our hybrid experience continues to grow, we feel strongly that this 20,000-hour warranty allows a customer the opportunity to go through a 15,000-hour rebuild/re-life without the expense of worrying about power electronic components.”

The warranty includes a 96-month (eight-year) or 20,000-hour (whichever comes first) non-prorated assurance on wheel motors, generators, power inverters and brake retarders. Certain customer conditions must be met to maintain warranty coverage. This includes component rotation between 15,000 and 18,000 hours; drive voltage cables replacement between 15,000 and 18,000 hours; and an annual dealer machine inspection.

The 536 horsepower 944K hybrid wheel loader features an EPA Interim Tier IV engine (IT4), and it can provide significant fuel savings over 9-yard3 loaders with conventional drivetrains*. The production-class wheel loader's brushless AC generators and motors, water-cooled brake resistors and solid-state power electronics deliver reliable, long-term performance to quarry and large-load applications.

For more information, visit http://www.deere.com/Quarry.

*Actual fuel consumption rates and savings will vary with machine application, utilization, operator and model of competitive unit.




Today's top stories

New Bridges Part of Iowa's $114M Madison Avenue Project

Eagle Bridge Co. Works On Final Leg of U.S. 35 Upgrade

Fay Preps Way for Pittsburgh International Airport Modernization Project

SAKAI Achieves Record Sales, Production

Takeuchi Recognizes Top Dealers at 2024 Dealer Summit

Muddy Water Dredging Christens Marlin Class Dredge

Indiana Officials Mark Start of 2024 Construction Season, Promote Safety

Leica Geosystems Launches its First Machine Smart Antenna — Leica iCON gps 120


 






aggregateequipmentguide-logo agriculturalequipmentguide-logo craneequipmentguide-logo forestryequipmentguide-logo truckandtrailerguide-logo
39.96250 \\ -83.00610 \\ Columbus \\ PA