List Your Equipment  /  Dealer Login

New Safer Goethals Bridge Spans Jersey, Staten Island

Mon March 18, 2019 - Northeast Edition #6
Emily Buenzle


“The cable-stay structure is ideal for the size of the bridge and the number of lanes,” said James E. Blackmore, program director for the Goethals Bridge Modernization Program.
“The cable-stay structure is ideal for the size of the bridge and the number of lanes,” said James E. Blackmore, program director for the Goethals Bridge Modernization Program.
“The cable-stay structure is ideal for the size of the bridge and the number of lanes,” said James E. Blackmore, program director for the Goethals Bridge Modernization Program. The $1.5 billion project, which had been under construction since 2014, features two identical cable-stayed spans with three 12-ft. lanes, 12-ft. outer shoulders and 5-ft. inner shoulders that connect Elizabeth, N.J., and Staten Island, Curbed reported.
(Port Authority of New York and New Jersey Photo)

The long-awaited Goethals Bridge opened officially in 2018 after years of construction.

"The completion and opening of the second span of the Goethals Bridge project represents one of the most important infrastructure enhancements undertaken in the New Jersey-New York metro region in more than eight decades," said New Jersey Gov. Phil Murphy at the time of its opening. "These critical improvements will ease congestion and provide a safer driving environment for daily commuters and the more than 32 million travelers who use the bridge annually."

The $1.5 billion project, which had been under construction since 2014, features two identical cable-stayed spans with three 12-ft. lanes, 12-ft. outer shoulders and 5-ft. inner shoulders that connect Elizabeth, N.J., and Staten Island, Curbed reported. The bridge is made up of 144 steel stay cables, each up to 400 ft. long and 13 in. in diameter. These cables connect the four sets of V-shaped concrete towers, which the Port Authority of New York and New Jersey said measure 272 ft. tall.

"The cable-stay structure is ideal for the size of the bridge and the number of lanes," said James E. Blackmore, program director for the Goethals Bridge Modernization Program.

The new span also contains "smart bridge" technology, where sensors continuously monitor critical areas.

The Port Authority chose Kiewit-Weeks-Massman to design and build the bridge.

The project was financed through a public-private partnership: the Port Authority paid one third of its cost, and NYNJ Link, a private partner, financed the rest. NYNJ Link leased the new bridge to the Port Authority for 35 years, until the funds are paid back. Then, the Port Authority will regain ownership of the bridge, the Wall Street Journal reported.

CEG




Today's top stories

Growing Interest in Construction Careers Among Younger People Means Jobs Filled, Deadlines Met

Larry Young Paving Tackles Grade-Separated Interchange in Texas

Caltrans, Crews Working to Repair Highway Landslides

FIRSTGREEN Industries Launches ROCKEAT Electric Skid Steer Loader

'Tiltrotator Effect' Increases as Energy Consumption Goes Down

VIDEO: Birmingham, Ala., Awarded $14.5M Fed Grant to Revitalize Its 'Black Main Street'

Pettibone Celebrates 75th Anniversary of Cary-Lift

Fay Preps Way for Pittsburgh International Airport Modernization Project


 






aggregateequipmentguide-logo agriculturalequipmentguide-logo craneequipmentguide-logo forestryequipmentguide-logo truckandtrailerguide-logo
39.96250 \\ -83.00610 \\ Columbus \\ PA