Construction Equipment Guide
470 Maryland Drive
Fort Washington, PA 19034
800-523-2200
To find other machines, start your search at the 'Equipment' tab, in our navigation bar, at the top of our site. More detailed links, for searching by manufacturer, or dealer, can be found on the front page of our site at here.
Fat Truck Revolutionizes Power Line Work With High-Speed Capstan Drive on Amphibious Vehicle
Zeal Motor Inc. announced the official launch of its new high speed capstan drive mounted on the Fat Truck. The high-speed capstan drive integrated on the back of an amphibious vehicle redefines the safety standards and the productivity level when working in harsh terrain on powerlines, according to the manufacturer....
AEP Texas to Rebuild Transmission Line Damaged by Hurricane Harvey
AEP Texas announced it will expedite the rebuilding of a vital power line in the Coastal Bend area that was devastated by Hurricane Harvey. The Aransas Pass – Port Aransas Transmission Line Rebuild Project components include:rebuilding approximately 8.1 miles of 69-kilovolt (kV) transmission line to help ensure electric reliability as the area continues to rebuild and recover from damage sustained during the storm;replacing fallen wooden structures with single-pole steel structures that will be more capable of withstanding hurricane-force winds, and;using existing company-owned easements or public easements....