List Your Equipment  /  Dealer Login

The Latest: Georgia Nuclear Plant Gets Tentative Up Vote

Tue September 25, 2018 - Southeast Edition
Associated Press


The nation's only major nuclear power plant under construction appears to still be alive after the owners voted to push forward despite another multibillion-dollar cost overrun.
The nation's only major nuclear power plant under construction appears to still be alive after the owners voted to push forward despite another multibillion-dollar cost overrun.

ATLANTA (AP) — The Latest on budget overruns in construction of a Georgia nuclear power facility (all times local):

8:00 p.m.

The nation's only major nuclear power plant under construction appears to still be alive after the owners voted to push forward despite another multibillion-dollar cost overrun.

But Oglethorpe Power said they're only willing to move forward with the construction of two new reactors at the Vogtle nuclear power plant near Waynesboro, Ga., if cost-control measures are implemented.

It is unclear how the other utilities that own a stake in the project will respond to the conditions.

The Municipal Electric Authority of Georgia and Georgia Power, the other two primary owners of the project, had previously said they're willing to move forward.

The project is billions of dollars over budget and years behind schedule.

A similar project in South Carolina died in July 2017 when the V.C. Summer plant was abandoned after going billions of dollars over budget.

3:45 p.m.

The board of a Georgia utility has voted to continue the expansion of a nuclear power plant that's years behind schedule and billons of dollars over budget.

The Municipal Electric Authority of Georgia's board voted unanimously Sept. 24, to continue building two new reactors at the Vogtle nuclear power plant near Waynesboro.

That leaves one co-owner, Oglethorpe Power, left to decide whether to move forward or abandon the project.

A third owner, Georgia Power, already indicated it's ready to push forward.

The critical votes came after a new $2.3 billion cost increase was recognized, bringing the total estimated cost to $27 billion. That triggered a clause in the ownership agreement where 90 percent of ownership needs to agree to forward.

A down vote from Oglethorpe Power could sink the project. Oglethorpe Power is expected to vote on it later this week.

11:15 a.m.

The utilities involved in a Georgia nuclear project are deciding whether to continue after a $2 billion cost increase.

The owners building two new reactors at the Vogtle nuclear power plant near Waynesboro, Georgia are set to vote on whether to move forward or abandon the project. Oglethorpe Power and the Municipal Electric Authority of Georgia could vote as early as Sept. 24.

A down vote by either could mean the project estimated to cost $27 billion is abandoned.

Another owner, Georgia Power, has indicated it is ready to continue after concluding that $2.3 billion in new cost overruns are expected, triggering the votes.

The Department of Energy on Friday sent a letter to the owners saying it would seek repayment of billions in federal loans if the project is abandoned.




Today's top stories

Fay Preps Way for Pittsburgh International Airport Modernization Project

Volvo CE Continues to Perform, Transform During Slower Q1 2024

American Bridge Co. Leads Conn.'s East Haddam Swing Bridge Project

Growing Interest in Construction Careers Among Younger People Means Jobs Filled, Deadlines Met

Pettibone Celebrates 75th Anniversary of Cary-Lift

Common Ground Alliance Hosts Conference & Expo in Colorado On Preventing Utility Damages

Powerco Hosts Mecalac Road Show Event in Clinton, N.J.

Site Prep Inc. of NC Adds Milling Services to Its Existing Highway Infrastructure Capabilities


 






aggregateequipmentguide-logo agriculturalequipmentguide-logo craneequipmentguide-logo forestryequipmentguide-logo truckandtrailerguide-logo
39.96250 \\ -83.00610 \\ Columbus \\ PA