List Your Equipment  /  Dealer Login

Wednesday Weekly Wrap-Up : April 4, 2018

Wed April 04, 2018 - National Edition
Omaha Media Group


Was your week a little busy? No worries! Here is a recap of the most popular stories from our website over the past week:

Contractors Fined Millions For Failing To Hire Local Workers During Arena Construction

During the construction of Detroit's $862.9 million Little Caesars Arena, only 25 percent of the hours worked by skilled tradesman were actual residents of the city. By March 2017, contractors have paid $2.9 million in fines for not meeting the 51 percent threshold by the city of Detroit. The city fined a total of 44 contractors, ranging from more than $51,000 for an electrical contractor down to $9.63 for an hourly painting contractor.

Baseball Team Donates Funds To Help Puerto Rico Rebuild

Months after Hurricane Maria devastated Puerto Rico, its infrastructure is still recovering. On March 27, the Los Angeles Dodgers announced their support to help get Puerto Rico back on its feet. The baseball team will donate $2 million to Habitat for Humanity of Puerto Rico to aid the rebuilding initiatives. Nearly six months after the devastating hurricane, Puerto Rico is still recovering from the damages sustained from the storm. About 100,000 residents are still without power.

Deadline Looms For Truckers To Use Electronic Logging Devices Or Face Penalties

The deadline as come and gone for commercial vehicle drivers that are not using electronic logging devices to track their driving hours. Drivers that are not using the electronic logging devices could be penalized by being placed out of service for 10 hours, assessing points against their driving records, and could possibly face civil fines. The regulation is intended to increase highway safety by ensuring that commercial drivers adhere to federal hours-of-service rules and take their required rest periods.

PennDOT Studies Harrisburg Transportation Master Plan

The PennDot Secretary announced two significant studies aimed at laying out a road map for enhancing the Harrisburg Transportation Center and the area that is adjacent to the station. The department has completed 90 percent of its design so far for the $15 million renovation and is working directly with Amtrak regarding a construction schedule.

Wells Fargo Center Reveals Next Phase Of Extensive Redesign

The next chapter of the Wells Fargo Center Renovation is planned to be completed by Fall of 2018. It will feature an entirely new Mezzanine level, which accommodates approximately 40 percent of the arena's total capacity. Not a single aspect of the Mezzanine level's original layout will remain once the work is completed. Highlights of the new Mezzanine will include: 150 new LED game-action screens, 8,000 new seats featuring cup holders, and expanded food and beverage locations with additional offerings.

These are just a few topics we have been discussing over the past week. For more news and industry updates, check out Construction Equipment Guide's Industry News Page and our Industry Blog Page.




Today's top stories

Eagle Bridge Co. Works On Final Leg of U.S. 35 Upgrade

Fay Preps Way for Pittsburgh International Airport Modernization Project

Volvo CE Continues to Perform, Transform During Slower Q1 2024

American Bridge Co. Leads Conn.'s East Haddam Swing Bridge Project

Pettibone Celebrates 75th Anniversary of Cary-Lift

Common Ground Alliance Hosts Conference & Expo in Colorado On Preventing Utility Damages

Going Beyond Diversity: Star Equipment's Rental Advantage

Volvo CE Launches Updated L30, L35 Compact Wheel Loaders


 






aggregateequipmentguide-logo agriculturalequipmentguide-logo craneequipmentguide-logo forestryequipmentguide-logo truckandtrailerguide-logo
39.96250 \\ -83.00610 \\ Columbus \\ PA