Sell Your Equipment  /  Dealer Login  /  Create Account

BNSF to Install 2nd Track From Idaho to Spokane Valley

Wed March 13, 2013 - West Edition #6
Construction Equipment Guide


BNSF Railway is making plans to install a second track from Hauser, Idaho, to the Spokane Valley.
(BNSF Railway photo)
BNSF Railway is making plans to install a second track from Hauser, Idaho, to the Spokane Valley. (BNSF Railway photo)

SPOKANE, Wash. (AP) Rising train traffic is prompting BNSF Railway to make plans to install a second track from Hauser, Idaho, to the Spokane Valley.

The project calls for a 4.4-mi. second track to be installed parallel to an existing BNSF mainline track, which carries freight from Seattle to the Midwest. The project is to be finished by 2035.

The Spokesman-Review said the project includes modifications of crossings, realignment of existing tracks, changes to existing railroad structures and construction of a new bridge over the Spokane River.

The goal is to ensure double track capacity across the Idaho Panhandle to the Spokane Valley.

An estimated 58 trains use the BNSF rail line every day. It's expected by 2035, that number will increase to 114 trains daily.

For more information, visit spokesman.com.




Today's top stories

Net-Zero Arrives: e-Revolution Picks Up Steam

E.B. 'Ed' Abel Jr. Passes Away

Tips for Selecting the Best Modern Fuel Storage Solution

Connecticut DOT to Make Repairs Following Tropical Storm Ida

USDOT to Provide $628M for I-405 Construction Project

Ritchie Bros. to Host Inside Edge Online Construction Panel

Kubota Tractor Corporation Closes Escrow, Acquires Land in Elk Grove, California, for New Western Division Operations

Through Economic Highs, Lows, Crestview Adapts, Continues to Grow


 






ceg-logo ceg-logo ceg-logo ceg-logo ceg-logo