List Your Equipment  /  Dealer Login

Bridge Replacement Project Under Way Along Route 3 in N.H.

Tue June 19, 2012 - Northeast Edition
Construction Equipment Guide


The New Hampshire Department of Transportation (NHDOT) announced the beginning of construction activity on the replacement of the U.S. Route 3 (River Road) bridge over the F.E. Everett Turnpike in Bedford.

This design-build project consists of the design and construction of a new bridge just north of the existing U.S. 3 bridge over the Everett Turnpike, with a new roadway approach that will tie in at the Target store entrance to the northwest and 500 ft. beyond Hawthorne Drive to the southeast.

Initial work involves tree clearing and ledge removal operations. The construction will progress with the construction of the new bridge and approach road work through 2012. Traffic should be switched over to the new bridge in late fall of 2012, with final slope work, removal of the existing bridge, and final paving completed by June 25, 2013.

E.D. Swett, of Concord, N.H., is the contractor for the $11.5 million “best value” contract. Louis Berger Group Inc., which has an office in Manchester, N.H., is designing the bridge.




Today's top stories

Blalock Crews Build TDOT's $67M Newport Bypass

New Bridges Part of Iowa's $114M Madison Avenue Project

Eagle Bridge Co. Works On Final Leg of U.S. 35 Upgrade

SAKAI Achieves Record Sales, Production

Takeuchi Recognizes Top Dealers at 2024 Dealer Summit

Equip Expo's Summer Giveaway Offers a Chance for Lifetime Trade Show Registration, Gift Card, Hotel Stay

Tennessee's Pugmill Systems LLC Expands Its Product Offerings to Include Concrete Plants

ASCENDUM Machinery Opens New Savannah, Ga., Facility








aggregateequipmentguide-logo agriculturalequipmentguide-logo craneequipmentguide-logo forestryequipmentguide-logo truckandtrailerguide-logo
39.96250 \\ -83.00610 \\ Columbus \\ PA