Create a CEG Account  /  CEG Login



Construction Begins at Churchill Downs

July 7, 2003 - Midwest Edition
Construction Equipment Guide

LOUISVILLE, KY (AP) Renovations at the track that’s home to the Kentucky Derby began Sunday after the last race of its summer meet.

The renovation is the second phase of a multimillion-dollar project to renovate Churchill Downs. Last year, the famed Twin Spires were refurbished and dozens of luxury suites were added atop the grandstands. Small pieces of wood from the spires were given to the first 5,000 visitors on Sunday.

The suites were the first ever at the 129-year-old track and are the most visible changes in the $121 million renovation.

The renovation work comes as the aging track looks for ways to hold on to gambling money that threatens to drift to casinos, most notably a nearby riverboat casino on the Indiana side of the Ohio River.

The $95 million second phase will include construction of more luxury suites. It also includes a new and expanded Turf Club and a new Skye Terrace, which includes Millionaire’s Row, where the rich and famous mingle on Derby Day.

The track will add simulcast facilities plus more dining rooms, kitchens and a new press box.


Today's top stories

Seabrook Bridge Construction Moves Toward October 2028 Completion

Yuba Pass Gets Two Bridge Replacements

TxDOT Widens 20 Mi. of U.S. 87 to Improve Safety, Increase Capacity

Core Equipment Group Strengthens Leadership Team

Liebherr R 915 Compact G8, R 917 Compact G8, R 920 Compact G8 Excavators Now Available

Diamond Mowers Strengthens Dealer Support Through Demo Days, Champion Training Events

Volvo Increases Use of Recycled Materials in New Heavy-Duty Truck Models

E2 Systems Turns Wheel Loaders Into High-Production Material Placers







×

Stay Ahead of the Market

Get weekly equipment news, auction updates, and dealer insights — trusted by thousands of industry professionals.



39.96118 \\ -82.99879 \\ Columbus \\ OH \\ US \\ 43215