List Your Equipment  /  Dealer Login

Construction Begins at Churchill Downs

Mon July 07, 2003 - Midwest Edition
Construction Equipment Guide


LOUISVILLE, KY (AP) Renovations at the track that’s home to the Kentucky Derby began Sunday after the last race of its summer meet.

The renovation is the second phase of a multimillion-dollar project to renovate Churchill Downs. Last year, the famed Twin Spires were refurbished and dozens of luxury suites were added atop the grandstands. Small pieces of wood from the spires were given to the first 5,000 visitors on Sunday.

The suites were the first ever at the 129-year-old track and are the most visible changes in the $121 million renovation.

The renovation work comes as the aging track looks for ways to hold on to gambling money that threatens to drift to casinos, most notably a nearby riverboat casino on the Indiana side of the Ohio River.

The $95 million second phase will include construction of more luxury suites. It also includes a new and expanded Turf Club and a new Skye Terrace, which includes Millionaire’s Row, where the rich and famous mingle on Derby Day.

The track will add simulcast facilities plus more dining rooms, kitchens and a new press box.




Today's top stories

Jobseekers Leveraging Career Market for In-Demand Skilled Trades

Value in Remanufacturing Construction Equipment: Reduce Cost, Downtime, Carbon Footprint

Buckley, PennDOT Restore I-95 to Usefulness in Philly

Meta Plans to Build $800M Next-Generation Data Center in Montgomery, Ala.

Demolition Crews Bring Down Largest Span of Baltimore's Collapsed Key Bridge

Flo Engineering Restoring Access to Critical Highway in California

Webber Working to Complete $300M Texas Interchange Project

Bobcat Installs Innovative Stationary Fuel Cells From HyAxiom at Two of Its Facilities








aggregateequipmentguide-logo agriculturalequipmentguide-logo craneequipmentguide-logo forestryequipmentguide-logo truckandtrailerguide-logo
39.96250 \\ -83.00610 \\ Columbus \\ PA