List Your Equipment  /  Dealer Login

Crews Taking Down 1959 Cleveland bridge

The remaining spans of the bridge will be brought down by controlled explosions next month.

Fri June 06, 2014 - Midwest Edition
Construction Equipment Guide


CLEVELAND (AP) - Crews have begun taking down the old 1959 Innerbelt Bridge in Cleveland, with trusses cut away making a big splash in the Cuyahoga (ky-uh-HOH’-guh) River.

Engineers designed a plan for the removal of each truss so the span remains stable during demolition. The steel trusses that fall into the river are being fished out by cranes and put on a barge. Some are being lowered to the ground.

The Plain Dealer (http://bit.ly/S1uD7U ) reports that the river will be closed through 6 a.m. Friday so the span can be removed to make way for a new bridge.

This is the second of four spans being manually removed. The remaining spans of the bridge will be brought down by controlled explosions next month.




Today's top stories

Blalock Crews Build TDOT's $67M Newport Bypass

New Bridges Part of Iowa's $114M Madison Avenue Project

Eagle Bridge Co. Works On Final Leg of U.S. 35 Upgrade

SAKAI Achieves Record Sales, Production

Takeuchi Recognizes Top Dealers at 2024 Dealer Summit

Equip Expo's Summer Giveaway Offers a Chance for Lifetime Trade Show Registration, Gift Card, Hotel Stay

Tennessee's Pugmill Systems LLC Expands Its Product Offerings to Include Concrete Plants

ASCENDUM Machinery Opens New Savannah, Ga., Facility








aggregateequipmentguide-logo agriculturalequipmentguide-logo craneequipmentguide-logo forestryequipmentguide-logo truckandtrailerguide-logo
39.96250 \\ -83.00610 \\ Columbus \\ PA