List Your Equipment  /  Dealer Login  /  Create Account

Duraclass Introduces All-Season Sidewinder Jr. Dump Body

The Sidewinder Jr. can slither slither into many narrow spots while minimizing clearance concerns.

Thu September 19, 2013 - National Edition
Construction Equipment Guide


DuraClass introduced the Sidewinder Jr. dump body for standard dump use, as well as winter snow and ice control. The 3 to 4 cu. yd. (2.3 to 3 cu m) Sidewinder Jr. is designed for medium duty truck applications and complements the larger 5 to 14 cu. yd. (3.8 to 10.7 cu m) capacity DuraClass Sidewinder dump body. With its compact size, the Sidewinder Jr. increases maneuverability on narrow roads and in metropolitan areas, while minimizing clearance concerns, according to the manufacturer.

The versatile body is easily prepared for unexpected early or late snowfalls and can be used for mid-winter construction events, such as water main breaks, without having to remove sanding equipment. The Sidewinder Jr. delivers salt/sand to the front of the truck’s tires through a conveyor system, providing added traction for traveling up and down hilly terrain. The unit’s low profile allows for safe traveling in minimum clearance areas such as under power lines, areas with low tree branches or under bridges.

DuraClass designs and manufactures a comprehensive range of premium Class 3 to 8 dump bodies, hoists, and related equipment and offers more than 100 years of engineering and manufacturing expertise.

For more information, call 800/255-4345 or visit www.duraclass.com.




Today's top stories

VIDEO: ConExpo Crushes Expectations

American Bridge Rehabilitates East Haddam Swing Bridge

Case Energizes Compact Equipment Market With Launch of Two Electrified Mini Excavators, D Series Mini Excavators

Volvo Construction Equipment Introduces Connected Load Out to Improve Jobsite Efficiency

Liebherr's New TA 230 Litronic Articulated Dump Truck

LeeBoy Introduces 8608 Asphalt Paver at ConExpo

Komatsu's Integrated Solutions Allow Data to Be Easily Shared

Mississippi DOT Plans Rehab of Freeways Through Jackson Later This Spring


 






ceg-logo ceg-logo ceg-logo ceg-logo ceg-logo
39.04690 \\ -77.49030 \\ Ashburn \\ PA