List Your Equipment  /  Dealer Login  /  Create Account

Engineers Consider Canoes, Kayaks in Plans to Design N.C. Bridge Over River

Mon May 07, 2018 - Southeast Edition #10
Construction Equipment Guide


The state North Carolina Transportation Department is ensuring people can float in the French Broad River as engineers design a new bridge over the river.
(rootsrated.com photo)
The state North Carolina Transportation Department is ensuring people can float in the French Broad River as engineers design a new bridge over the river. (rootsrated.com photo)

ASHEVILLE, N.C. (AP) State engineers aren't just considering cars and trucks as they draw plans to widen Interstate 26 in western North Carolina. They're also looking out for canoes and kayaks.

The Asheville Citizen-Times reported the state Transportation Department is ensuring people can float in the French Broad River as engineers design a new bridge over the river.

The state will remove bridge supports in the river between the Brevard Road and Long Shoals Road interchanges.

I-26 will be widened from four lanes to eight between I-40 and Airport Road and to six lanes from there south to the U.S. 25 exit in Flat Rock. Construction is scheduled to begin in 2019 and take about four years.

Spokesman David Uchiyama said DOT will maintain a marked safe corridor for boaters during daylight hours.




Today's top stories

Groundwater-Capture Trench to Aid Response

Unstoppable Rise of Compact Track Loader

Manufacturers, Fuel Providers Want Seat at Emissions Regulation Table

Hitachi Construction Machinery Americas Rolls Out ZW220-7 Wheel Loader

Infrastructure Investment Law Is Working, ARTBA Chair Paula Hammond Tells Congressional Subcommittee

Wacker Neuson Introduces All-New 2.5-ton Excavator

Liebherr Premieres H964 Hydrogen Prototype Engine

Sustainable Operation Meets Performance in BOMAG BT 60 e Tamper


 






ceg-logo ceg-logo ceg-logo ceg-logo ceg-logo
39.04690 \\ -77.49030 \\ Ashburn \\ PA