Create a CEG Account  /  CEG Login



Engineers Consider Canoes, Kayaks in Plans to Design N.C. Bridge Over River

- Southeast Edition #10

The state North Carolina Transportation Department is ensuring people can float in the French Broad River as engineers design a new bridge over the river.
(rootsrated.com photo)
The state North Carolina Transportation Department is ensuring people can float in the French Broad River as engineers design a new bridge over the river. (rootsrated.com photo)

ASHEVILLE, N.C. (AP) State engineers aren't just considering cars and trucks as they draw plans to widen Interstate 26 in western North Carolina. They're also looking out for canoes and kayaks.

The Asheville Citizen-Times reported the state Transportation Department is ensuring people can float in the French Broad River as engineers design a new bridge over the river.

The state will remove bridge supports in the river between the Brevard Road and Long Shoals Road interchanges.

I-26 will be widened from four lanes to eight between I-40 and Airport Road and to six lanes from there south to the U.S. 25 exit in Flat Rock. Construction is scheduled to begin in 2019 and take about four years.

Spokesman David Uchiyama said DOT will maintain a marked safe corridor for boaters during daylight hours.


Today's top stories

SAKAI Marks 50 Years in North America, 25 Years in Georgia

Illinois' $400M WaterLink Project Begins

Single Interconnected Ecosystem: Physical, Digital Infrastructure Overlap Muddies Concept of Lone Assets, Individual Issues

AEDF's Indianapolis Event Connects 300 Students to Industry

Royals Select Construction Team for New Ballpark District

Foley Equipment Launches Cat Compact at Wichita Campus

Major Mississippi Highway, Bridge Projects Advance

Final Beam Marks Milestone for Guitar-Shaped Terminal





×

Stay Ahead of the Market

Get weekly equipment news, auction updates, and dealer insights — trusted by thousands of industry professionals.