List Your Equipment  /  Dealer Login

Felling Trailers Opens New Powder Coat Paint Facility

Wed October 04, 2023 - National Edition #21
CEG/Felling Trailers Inc.



Felling Trailers’ new powder coat paint facility
(Felling Trailers photo) The trolley system is used to carry trailers and components horizontally through the 13-stage process.
(CEG photo) The staging area is where trailers and components are brought to temperature, dry off and/or melt off if covered with snow, prior to being loaded to a trolley and starting the process.
(CEG photo) Trailer post blast — steel grit blast is used to blast all trailers and components to a near white level.
(CEG photo) Entrance to the five-stage wash operation that cleans the steel, provides corrosion preventative and prepares steel for ideal adhesion.
(CEG photo) A primed trailer enters the topcoat process.
(CEG photo) The powder coat applicator uses a three-axis pneumatic lift to ensure complete coverage is achieved.
(CEG photo) A completed trailer exits the cool down tunnel after going through the full cure oven.
(CEG photo)

Felling Trailers Inc. announced the opening of its new powder coat paint facility at 1525 Main St. S in Sauk Centre, Minn. The 92,000-sq.-ft. facility will speed up the throughput of trailers, as paint has historically been a bottle neck in the production process. The new facility will alleviate this issue with its higher output capacity.

This new facility will allow for application of a powder coat paint finish to trailers and components through an automated process utilizing GEMA Technology with a Therma-Tron-X-Inc. (TTX) sensor trolley track system.

"Back in 2016, when we first started our planning process, we were insistent that the performance characteristics exceed anyone else in the industry," said Patrick Jennissen, vice president of sales/marketing of Felling Trailers Inc. "We have always prided ourselves on aesthetics, longevity and performance of our paint. Our customers have come to expect that from us, and we wanted to make sure that we exceeded their expectations."

A staging area allows product to be placed prior to being loaded to a trolley. Additional features include an E-Room — humidity and temperature-controlled rooms that provide the optimal environment for the application of powder coating and six 3-axis pneumatic lift systems — two for blast, two in the primer booth and two in the topcoat booth.

"We knew at the outset that solution would need to be flexible to allow us to more easily adapt to new technology up until it goes live and also beyond," said Brenda Jennissen, CEO of Felling Trailer Inc. "This strategy will allow us to always being driving innovative coating solutions in the industry moving forward."

For more information, visit felling.com. CEG

This story also appears on Truck and Trailer Guide.




Today's top stories

Make Eliminating Jobsite Distractions Company Safety Goal

Two Firms Give Burned Highway New Life

VIDEO: Komatsu Holds Demo Days at Cartersville Customer Center

ABC: Over Half of March State Construction Unemployment Rates Down From a Year Ago

Allen Engineering Hosts 60th Anniversary Celebration

Contractors' Plate Full On Interstate 35 in Texas

Space Coast Leaders, Residents Excited About Planned Brightline Rail Station in Cocoa

Attachments International Debuts Severe Service Demolition Grapple


 






aggregateequipmentguide-logo agriculturalequipmentguide-logo craneequipmentguide-logo forestryequipmentguide-logo truckandtrailerguide-logo
39.96250 \\ -83.00610 \\ Columbus \\ PA