Create a CEG Account  /  CEG Login



INDOT Selects Superior Construction for Its 80/94 FlexRoad CMGC Project

INDOT has selected Superior Construction for the 80/94 FlexRoad CMGC project, set to enhance safety and efficiency in the I-80/I-94 corridor spanning Indiana and Illinois. The project includes TSMO strategies, ATM and ITS solutions, pavement restoration, and interchange modifications. Construction is expected to start in 2025.

April 8, 2025 - Midwest Edition #8
Indiana Department of Transportation

INDOT graphic

The Indiana Department of Transportation (INDOT) announced that the agency has entered into a Construction Manager General Contractor (CMGC) agreement with Superior Construction Co. Inc. to provide preconstruction services for the 80/94 FlexRoad project. This is the second CMGC project for INDOT.

The 80/94 FlexRoad project in Lake County, Ind., and Cook County, Ill., includes the implementation of Transportation Systems Management and Operations (TSMO) strategies to maximize the safety and efficiency of the existing I-80/I-94 corridor. Also known as the Borman Expressway, the 14-mi. segment spans from the I-65 and I-80/94 interchange in Indiana to the I-80/94 and IL-394 interchange in Illinois.

The project will implement integrated Active Traffic Management (ATM) and Intelligent Transportation System (ITS) solutions including improved digital message signs (DMS), variable speed limits, dynamic lane control, dynamic shoulder lanes, queue warning and ramp metering throughout the project corridor.

Other work includes fiber optic improvements throughout the corridor, modifying the I-65 and Broadway interchanges with I-80/I-94, concrete pavement restoration, installation of gantry structures over I-80/I-94 and drainage improvements.

The CMGC delivery method includes two project phases, the preconstruction phase and the construction phase.

The CMGC preconstruction phase is expected to begin in April 2025, with construction expected to start in late summer or early fall 2025. Design, led by Parsons Corp., is anticipated to be complete in 2026.

For more information, visit IndianaFlexRoad.com.


Today's top stories

$284M Chester Bridge Nears Completion

George & Swede's Michael 'Mike' Doyle Passes Away, 77

CEC Celebrates Safety Week With Training, Safety Fair

Brooks Tractor Holds John Deere Event in Sun Prairie

Standing Out in the Crowd: Construction Workforce Sees Much Value in Earning Credentials

Gulf Coast JCB Celebrates Grand Opening in Baton Rouge

Va. Transportation Board Approves Six-Year Improvement Program

Why Backhoe Loaders Still Earn Their Place on Roadbuilding Projects


 





×

Stay Ahead of the Market

Get weekly equipment news, auction updates, and dealer insights — trusted by thousands of industry professionals.



39.96118 \\ -82.99879 \\ Columbus \\ OH \\ US \\ 43215