McCormick Sand Taps Shoring Solution for MCC in Mich.

Wed August 05, 2009 - Midwest Edition
James McRay


Muskegon Community College (MCC) recently began work renovating several buildings on its Western Michigan campus. One challenging renovation was the addition of a new elevator in the Student Union Learning Center. The new elevator was a challenge because the elevator shaft needed to be built in the corner of two exterior walls accessing three underground floors. A 28 ft. (8.5 m) deep excavation was required to pour-in-place the new concrete shaft.

Excavating within the corner of two existing walls is an exceedingly challenging operation, much less shoring the excavation 28 ft. deep for an extended period time. Taking on the daunting task was McCormick Sand Inc. of Muskegon, Mich.

Finding a Shoring Solution

Whatever shoring McCormick chose, it needed to be installed directly along the two perpendicular exterior walls where the elevator shaft was to be built. This severely limited the choices of shoring or shielding that was feasible. Joel McCormick, president of McCormick Sand, had some experience with a slide rail shoring system, and thought that it might be a solution for the difficult excavation project.

“I’ve worked with Efficiency Production in the past for other shoring items, so I gave them a call first to talk about maybe using slide rail on this project,” said McCormick. “I talked with Greg [Ross, Efficiency’s slide rail manager] for a short time, and he was sure Slide Rail would work. He came out to the site to take some preliminary photos, and soon we had a plan.”

“Dig and Push” System

Fits in Tight Spots

Efficiency’s universal slide rail is a component shoring system comprised of steel panels (similar to trench shield sidewalls) and vertical steel posts. The system can be used in a variety of configurations, such as small four-sided pits; large unobstructed working pits as big as 50 by 50 ft. (15 by 15 m) with Efficiency’s ClearSpan system; or in a linear multi-bay configuration to install length of pipe more than 40 ft. (12 m).

Slide rail is installed simultaneously as the trench or pit is excavated by sliding the panels into integrated rails on the posts — an outside slotted rail first, then an open-face rail on the inside — then pushing the panels and posts incrementally down to grade as the pit is dug; a process commonly referred to as a “dig and push” system. Efficiency Production is the only slide rail manufacturer to offer an open-face rail design on its slide rail posts, according to the manufacturer.

“I knew that our slide rail was going to work, because it is designed and engineered to be installed in the tightest of spots, and in all types of soil conditions,” said Ross. “For this project, we came up with a modified 4-sided configuration that was open on one side against the wall, and we used linear posts and a parallel beam spreader assembly instead of panels against that wall.”

Ross was onsite for the initial installation. The slide rail system for this project also was unique in that it was designed to be partially removed as soon as it was to grade. When the entire system was completely installed to 28 ft. (8.5 m), the corner posts were tied back with chains so that the panels and parallel beam assembly along the building’s perpendicular exterior walls, and the linear post in the buildings apex could be pulled up 16 ft. (4.8 m) to make room for the elevator shaft to be cast-in-place.

Muskegon Construction, a Construction Management firm, is managing the entire renovation project at MCC. The renovations of the Student Union Learning Center, including the new elevator, is Phase Two of an overall $1.2 million project which began in April 2009, and will be completed in September. The concrete work on the elevator shaft is being performed by Patron Construction, of Holton, Mich.

The elevator shaft is being cast-in-place in stages. After setting an 18 in. (46 cm) thick foundation slab, Patron poured 16 ft. of the elevator shaft at which point the slide rail system was backfilled and removed up to that point so the remainder of the shaft could be completed. The entire 14 ft. square (1.3 sq m), 12 in. (30.5 cm) thick concrete shaft will be 40 ft. tall.

Installing Slide Rail,

Overcoming Obstacles

McCormick’s operator, Denny Geeting, was impressed with Efficiency’s slide rail:

“It went in very easily, faster than what I expected,” he said.

McCormick concurred, though the “pulling up” of the components to make room for the elevator shaft took a bit of time, and help was called in.

“The slide rail went in the ground very smoothly. Then it took us a long time to get the two sides of the system against the building’s foundation high enough to cast the first portion of the elevator shaft,” said McCormick. “I called Greg and asked him to come back out and see how we were doing. He came back out, and showed us a better way to attach the chains to the post so that we could pull it up easier. We got the final few inches pulled up quickly after that.”

McCormick used a Cat 345 to install the slide rail system; then a John Deere 892 excavator to pull up the system’s components to make room for the elevator shaft, and then eventually to remove the system entirely.

McCormick Sand Inc. was founded in 1962 by James McCormick. The company originally specialized in processing and mining specialty sand for castings, fiberglass, and other sand-based products. Son, Joel and grandson Jessie took over the business in 2002, moving into small general construction, though sand mining remains a small part of the business.

For more information, visit www.mccormicksand.com.




Today's top stories

Blalock Crews Build TDOT's $67M Newport Bypass

New Bridges Part of Iowa's $114M Madison Avenue Project

Eagle Bridge Co. Works On Final Leg of U.S. 35 Upgrade

SAKAI Achieves Record Sales, Production

Takeuchi Recognizes Top Dealers at 2024 Dealer Summit

Equip Expo's Summer Giveaway Offers a Chance for Lifetime Trade Show Registration, Gift Card, Hotel Stay

Tennessee's Pugmill Systems LLC Expands Its Product Offerings to Include Concrete Plants

ASCENDUM Machinery Opens New Savannah, Ga., Facility


 






aggregateequipmentguide-logo agriculturalequipmentguide-logo craneequipmentguide-logo forestryequipmentguide-logo truckandtrailerguide-logo
39.96250 \\ -83.00610 \\ Columbus \\ PA