Create a CEG Account  /  CEG Login



Police Arrest Pipeline Protesters in North Florida

A 516-mile-long natural gas pipeline that is being built through three Southeastern states is now the target of protesters.

November 14, 2016 - Southeast Edition
Construction Equipment Guide

Sheriff's Deputy Jeff Manning says all of the people arrested were interfering with a truck getting to the work site, and that the charges included disorderly conduct and trespassing.
Sheriff's Deputy Jeff Manning says all of the people arrested were interfering with a truck getting to the work site, and that the charges included disorderly conduct and trespassing.

GAINESVILLE, Fla. (AP) - Police have arrested 14 protesters near the north Florida construction site for a segment of a 516-mile-long natural gas pipeline that is being built through three Southeastern states.

The Gainesville Sun reports (http://bit.ly/2fPba8I ) that the Gilchrist County Sheriff's Office made the arrests on Saturday, including one man who had locked himself to a truck that was delivering water.

Sheriff's Deputy Jeff Manning says all of the people arrested were interfering with the truck getting to the work site, and that the charges included disorderly conduct and trespassing.

The Sabal Trail pipeline project is a joint effort by Spectra Energy, Duke Energy and Florida Power & Light.

It will carry natural gas from Alabama, through Georgia, into Florida.

The Sabal Trail pipeline joins a long list of pipeline projects, like the Dakota Access Pipeline, that have been surrounded by controversy over the past year.


Today's top stories

$245M FTE Project Expands Central Polk Parkway

Standing Out in the Crowd: Construction Workforce Sees Much Value in Earning Credentials

Atkinson, WSDOT Team Up to Improve Connections Near Puget Sound

TxDOT Widens 20 Mi. of U.S. 87 to Improve Safety, Increase Capacity

George & Swede's Michael 'Mike' Doyle Passes Away, 77

Bobcat Company Celebrates America's 250th With Limited 'Founders Edition' Zero-Turn Mower

Rep. Frank J. Mrvan Tours Hitachi Global Air Power, Highlights Regional Manufacturing Strength

Construction of Roanoke Hotel and Convention Center to Start in September


 





×

Stay Ahead of the Market

Get weekly equipment news, auction updates, and dealer insights — trusted by thousands of industry professionals.



39.96118 \\ -82.99879 \\ Columbus \\ OH \\ US \\ 43215