Create a CEG Account  /  CEG Login
☰



Allen Introduces PRO430E Walk-Behind Trowel

- National Edition
Allen Engineering

The PRO430E edger walk-behind trowel features a rotating edge ring that is perfect for troweling along the edges of walls or around protruding pipe and conduit, according to the manufacturer.
The PRO430E edger walk-behind trowel features a rotating edge ring that is perfect for troweling along the edges of walls or around protruding pipe and conduit, according to the manufacturer.
The PRO430E edger walk-behind trowel features a rotating edge ring that is perfect for troweling along the edges of walls or around protruding pipe and conduit, according to the manufacturer.  The PRO430E edger fits right in between the 24 in. (61 cm) VP424 edger and the 36 in. (91 cm) PRO436E in Allen’s lineup.

Allen, a leader in concrete finishing equipment, announced the debut of the 2019 PRO430E edger walk-behind trowel. This new trowel features a rotating edge ring that is perfect for troweling along the edges of walls or around protruding pipe and conduit, according to the manufacturer.

Allen is bringing the PRO430E back by popular demand. The PRO430E edger fills out Allen's edger lineup. It fits right in between the 24 in. (61 cm) VP424 edger and the 36 in. (91 cm) PRO436E. This in-between size allows the machine to easily fit through standard doorways while also maintaining a good power and weight combination.

PRO430E standard features include:

  • CH270 7hp Kohler gasoline engine
  • The spinning edge ring allows finishing within 5/16 in. (.8 cm) of walls or pipes
  • Choice of fine pitch or rapid pitch handles accommodate varying blade adjustment preferences • Two year warranty assures contractors that this machine is contractor tough
  • Heavy duty lifting hook for convenient placing on jobsite

For more information, visit www.alleneng.com.

To read more stories about Allen Engineering, click here.


Today's top stories

Crews Launch Alaska's Tallest Bridge

Metallica-Inspired 'Hetskid' Hits Charity Auction

Skanska USA Civil West Builds Freeway Extensions, Bridge Work On I-15

Condit Excavation Grows Base in Competitive DFW

W.W Clyde Seeks to Deliver UDOT's Pioneer Crossing Project by Years End

Eight Women Honored, Contributions to Transportation Construction Industry

Jacobs Lands $750M Central Utah Water Conservancy District Project Contract

Work Under Way On Engineering Future Technologies Building at CSU





×

Stay Ahead of the Market

Get weekly equipment news, auction updates, and dealer insights — trusted by thousands of industry professionals.