List Your Equipment  /  Dealer Login  /  Create Account

LiuGong North America Introduces 388B CTL

Wed September 04, 2019 - National Edition
LiuGong


With an operating weight of 11,442 lbs. (5,190 kg), the 388B is one of the market’s largest CTLs for those who need highest productivity or hydraulic capabilities. Its 0.78 cu. yd. (.6 cu m) bucket capacity makes the 388B an efficient scoop for loading, unloading or relocating material.
With an operating weight of 11,442 lbs. (5,190 kg), the 388B is one of the market’s largest CTLs for those who need highest productivity or hydraulic capabilities. Its 0.78 cu. yd. (.6 cu m) bucket capacity makes the 388B an efficient scoop for loading, unloading or relocating material.

LiuGong North America has introduced its first compact track loader, the 388B CTL. Built specifically for the demanding North American market, the 388B gives its customers their first track machine made with the same build quality and backed by the same customer support of all LiuGong product lines.

With an operating weight of 11,442 lbs. (5,190 kg), the 388B is one of the market's largest CTLs for those who need highest productivity or hydraulic capabilities. Its 0.78 cu. yd. (.6 cu m) bucket capacity makes the 388B an efficient scoop for loading, unloading or relocating material.

An industry-standard quick coupler design enables the 388B to receive the same wide array of attachments that skid steers in the same class size utilize — from pallet forks, brooms and blades to snow plows, pushers, blowers and more.

Powered by a 94 hp Tier IV Final 854F Perkins engine, third-valve auxiliary hydraulics come standard on the 388B machine, as does an electrical connection, conveniently located in the hook-up array. Hydraulic flow is 25.5 gpm or 35.9 gpm operating on the high flow option.

For more information, visit www.liugongna.com.




Today's top stories

Kiewit Tackles Draining, Grading Issues On I-80 in California

President Joe Biden, U.S. Senator Rob Portman Receive ARTBA's Highest Honor

C.W. Matthews Expects to Complete $111M Phase 2 of Jackson County, Ga. Project in Coming Months

Boston Residents Brace for More Traffic From $157M Repairs to Sumner Tunnel

ConExpo-Con/AGG, IFPE Bring Success to Firms Globally

Officials in SW Florida Consider Redesign for 58-Year-Old Cape Coral Bridge

Sakai America Introduces New Hires

Trio of Bridges Undergoing Upgrade on U.S. Highway 4 in Canaan, N.H.


 






ceg-logo ceg-logo ceg-logo ceg-logo ceg-logo
39.04690 \\ -77.49030 \\ 50.243.58.82 \\ Ashburn \\ VA