Memorial Bridge Drivers Face Two Years of Construction Work

Mon October 15, 2018 - Northeast Edition
Associated Press


The bridge was dedicated in 1932 and connects the Lincoln Memorial to Arlington National Cemetery. It was designed as a symbolic connection between the North and South. (Photo Credit: Wikipedia)
The bridge was dedicated in 1932 and connects the Lincoln Memorial to Arlington National Cemetery. It was designed as a symbolic connection between the North and South. (Photo Credit: Wikipedia)

ARLINGTON, Va. (AP) — Commuters who use the Memorial Bridge to navigate between Virginia and the District of Columbia are facing two years of headaches.

Beginning Oct. 15, the six-lane bridge over the Potomac River will be reduced to three lanes as the National Park Service delves into the heart of a $227 million rehabilitation project announced last year.

The Park Service plans on weekdays to run two inbound lanes in the morning and one outbound lane. That will reverse on weekday afternoons and evenings.

On weekends and holidays, two lanes will be inbound and one will be outbound.

The bridge was dedicated in 1932 and connects the Lincoln Memorial to Arlington National Cemetery. It was designed as a symbolic connection between the North and South.

The lane restrictions are expected to remain through 2020.




Today's top stories

Industry Urges Workers to Get COVID Vaccine

Metro Overpass Collapses in Mexico City, Leaving Many Dead, Injured

Five Stand-On Skid Steer Attachments to Invest In

Pegasus Link Constructors Leads $1.7B Project

Doosan Bobcat Helps Professionals Build a Better Tomorrow With Mobile Training Lab

Bobcat Company, Country Artist Justin Moore Announce Partnership, Fan Sweepstakes

Hall County, Ga., the Site of Seven Current or Future Road Projects

VIDEO: Volvo CE Delivers Its Version of the Factory 4 Tomorrow


 






ceg-logo ceg-logo ceg-logo ceg-logo ceg-logo