Create a CEG Account  /  CEG Login



Mo. Crews Finishing U.S.’s First Stimulus Project

August 11, 2010 - National Edition
Construction Equipment Guide

OSAGE BEACH, Mo. (AP) Missouri crews are finishing work on the nation’s first construction project to be funded by the federal stimulus package.

Missouri transportation officials plan to open the new highway bridge over the Osage River in Tuscumbia on Aug. 16, The Lake Sun Leader reported. The bridge carries traffic on Missouri 17 over the tributary of the Missouri River about 30 mi. southwest of Jefferson City.

Work on replacing the nearly 80-year-old bridge started just minutes after President Barack Obama signed the $787 billion stimulus package into law last February. Members of the Missouri Highways and Transportation Commission monitored Obama’s bill signing ceremony by video and voted seconds later to approve the bridge replacement and three other projects.

Within a minute, commissioners handed a check to a contractor who had workers standing by. A backhoe operator began digging a hole for a support beam of the new bridge while other workers began working on the old span.

The old bridge was closed to large trucks in 2007 because of structural concerns. A badly deteriorating steel beam was identified during inspections conducted after a deadly Minnesota bridge collapse.

The new bridge will be 28 ft. (8.5 m) wide, an extension of 8 ft. (2.4 m). Transportation officials closed traffic over the river to allow roads to be connected to the new bridge.

”This closure is necessary to make the tie-ins because the roadway elevations to the new bridge differ significantly from the old bridge,’ said Patty Lemongelli, a construction and materials engineer for the Department of Transportation.


Today's top stories

Closures Key to Security Paving Delivering I-5 Burbank Pavement Rehab Project

Tulsa's 'Stonehenge' Disappearing Under Freeway Flyovers

Mesa Gateway Airport Runway Reconstruction Nears Completion

Water Work: Two Crawler Cranes From ALL Help Build Underwater Pipeline Off Myrtle Beach

Gulf Coast JCB Celebrates Grand Opening in Baton Rouge

Superior, Commonwealth Equipment Partner to Expand Equipment, Parts, Service Across North Mid-Atlantic

VIDEO: World's Largest Electric Handlers Transform Port

Baschmann Services Holds Anaconda Open Day Event







×

Stay Ahead of the Market

Get weekly equipment news, auction updates, and dealer insights — trusted by thousands of industry professionals.



39.96118 \\ -82.99879 \\ Columbus \\ OH \\ US \\ 43215