List Your Equipment  /  Dealer Login  /  Create Account

EDGE Provides Enhanced Performance

Wed May 17, 2017 - National Edition
Manitou Americas


The EDGE pickup/hopper broom with a waterless dust abatement system comes complete with hoses and couplers as well as a bolt-on cutting edge to fit most compact loaders. This unit is available in 60, 72 and 84 in. (152, 182 and 213 cm) widths.
The EDGE pickup/hopper broom with a waterless dust abatement system comes complete with hoses and couplers as well as a bolt-on cutting edge to fit most compact loaders. This unit is available in 60, 72 and 84 in. (152, 182 and 213 cm) widths.

Manitou Americas Inc. announced the EDGE pickup/hopper broom with waterless dust abatement system to their broom lineup for compact loader attachments.

The EDGE pickup/hopper broom with a waterless dust abatement system is a cost-effective investment for contractors and rental houses. It provides enhanced performance in milling applications, material pickup, parking lot, road maintenance and job-site cleanup, according to the manufacturer. This unit works well for indoor application cleanup, as it features a “waterless” dust abatement system.

The pickup/ hopper broom with a waterless dust abatement system features:

  • A large industrial filter, eliminating potentially large dust clouds
  • 12 volt shaker dislodges loose debris from the filter directly into the hopper
  • A slotted brush assembly allowing the brush to move vertically for ease of operation
  • A hydraulic cylinder that drops the bucket floor when dumping dirt and debris
  • Two caster wheels mounted on the side toward the front of the broom to prevent the user from rolling too far forward, preventing damage to the skirting and the frame

The EDGE pickup/hopper broom with a waterless dust abatement system comes complete with hoses and couplers as well as a bolt-on cutting edge to fit most compact loaders. This unit is available in 60, 72 and 84 in. (152, 182 and 213 cm) widths.




Today's top stories

Kiewit Tackles Draining, Grading Issues On I-80 in California

President Joe Biden, U.S. Senator Rob Portman Receive ARTBA's Highest Honor

C.W. Matthews Expects to Complete $111M Phase 2 of Jackson County, Ga. Project in Coming Months

Boston Residents Brace for More Traffic From $157M Repairs to Sumner Tunnel

ConExpo-Con/AGG, IFPE Bring Success to Firms Globally

Officials in SW Florida Consider Redesign for 58-Year-Old Cape Coral Bridge

Sakai America Introduces New Hires

Trio of Bridges Undergoing Upgrade on U.S. Highway 4 in Canaan, N.H.


 






ceg-logo ceg-logo ceg-logo ceg-logo ceg-logo
39.04690 \\ -77.49030 \\ 50.243.58.82 \\ Ashburn \\ VA