List Your Equipment  /  Dealer Login

Granite, Teichert Team Wins $275M Project in Sacramento

Tue July 02, 2019 - West Edition #14
Construction Equipment Guide


Granite announced that the joint venture team comprised of Granite and Teichert Inc. has been awarded a $275 million contract by the California Department of Transportation (Caltrans) for the SAC 5 Corridor Enhancement Project in Sacramento, Calif.

The project will rehabilitate 67 lane mi. of Interstate 5 beginning south of the Elk Grove Boulevard Overcrossing and extending to the American River Viaduct. Scope of work includes adding 23 mi. of High Occupancy Vehicle lanes; eight maintenance vehicle pullouts; two sound walls; replacement of a pedestrian overcrossing; and installation of fiber optic lines.

In addition, the team intends to recycle existing concrete pavement and other materials on site to reduce waste and cost as well as minimize truck haul trips.

Construction is scheduled to begin in fall 2019 and be completed by fall 2021.

For more information, visit dot.ca.gov/d3/projects/subprojects/0H10U/index.html and graniteconstruction.com.




Today's top stories

Make Eliminating Jobsite Distractions Company Safety Goal

Two Firms Give Burned Highway New Life

VIDEO: Komatsu Holds Demo Days at Cartersville Customer Center

ABC: Over Half of March State Construction Unemployment Rates Down From a Year Ago

Allen Engineering Hosts 60th Anniversary Celebration

Contractors' Plate Full On Interstate 35 in Texas

Space Coast Leaders, Residents Excited About Planned Brightline Rail Station in Cocoa

Attachments International Debuts Severe Service Demolition Grapple


 






aggregateequipmentguide-logo agriculturalequipmentguide-logo craneequipmentguide-logo forestryequipmentguide-logo truckandtrailerguide-logo
39.96250 \\ -83.00610 \\ Columbus \\ PA