List and Sell Your Equipment  /  Dealer Login  /  Create Account

Granite, Teichert Team Wins $275M Project in Sacramento

Tue July 02, 2019 - West Edition #14
Construction Equipment Guide


Granite announced that the joint venture team comprised of Granite and Teichert Inc. has been awarded a $275 million contract by the California Department of Transportation (Caltrans) for the SAC 5 Corridor Enhancement Project in Sacramento, Calif.

The project will rehabilitate 67 lane mi. of Interstate 5 beginning south of the Elk Grove Boulevard Overcrossing and extending to the American River Viaduct. Scope of work includes adding 23 mi. of High Occupancy Vehicle lanes; eight maintenance vehicle pullouts; two sound walls; replacement of a pedestrian overcrossing; and installation of fiber optic lines.

In addition, the team intends to recycle existing concrete pavement and other materials on site to reduce waste and cost as well as minimize truck haul trips.

Construction is scheduled to begin in fall 2019 and be completed by fall 2021.

For more information, visit dot.ca.gov/d3/projects/subprojects/0H10U/index.html and graniteconstruction.com.




Today's top stories

Picturesque Virginia Valley Site of I-81 Bridge Replacement Project

Advanced Cat Grade Technologies Expanded to Cat 6- to 10-ton Next Generation Mini Hydraulic Excavators

MTSU Celebrates Concrete Industry Management Program

New Snowplow Technology Targets Efficiency, Safety

VIDEO: Walsh Puts Merchant's Bridge Back On Track

TxDOT's El Paso District Wins Inaugural Seal Coat Award

Odessa's Permian Basin International Oil Show Returns

VIDEO: Bristol, Va., Mall to Be Demolished Ahead of Casino Construction


 






ceg-logo ceg-logo ceg-logo ceg-logo ceg-logo