List Your Equipment For Free  /  Seller Login

Nebraska Department of Transportation


Nebraska DOT Breaks Ground On U.S.-30 Grand Island West Expansion

On June 10, the Nebraska Department of Transportation (NDOT), alongside Mayor Roger Steele of Grand Island, Mike Werner, project manager of Werner Construction Inc., and Wes Wahlgren, division engineer of NDOT District 4, hosted a groundbreaking ceremony for the U.S.-30 Grand Island West project....


NDOT Partner, Benesch, Wins Award for Lincoln South Beltway Project

The Nebraska Department of Transportation (NDOT) congratulates Benesch on earning an American Council of Engineering Companies 2024 Engineering Excellence Award for its work on the Lincoln South Beltway — one of the largest projects ever undertaken by NDOT....


Nebraska DOT Establishes Trade Skills Scholarship Program

The Nebraska Department of Transportation recently established the "Good Life, Great Journey" program to provide scholarships for individuals pursuing two-year technical degrees in critical transportation-related fields, such as diesel technology, electronic systems, drafting/design and land surveying....


NDOT Receives $17.36M From Fed for Airport Improvements

The Federal Aviation Administration (FAA) announced that $17,362,302 in federal grants were awarded to seven Nebraska airports, in Ainsworth, Burwell, Norfolk, North Platte, Scottsbluff, Sidney and Wayne, according to the Nebraska Department of Transportation (NDOT)....


Nebraska DOT, Officials Celebrate Opening of Lincoln South Beltway

The Nebraska Department of Transportation (NDOT), together with Gov. Pete Ricketts, NDOT Director John Selmer, Mayor Leirion Gaylor Baird, and other state and local dignitaries gathered Dec. 14 to celebrate the opening of the Lincoln South Beltway....


Koss Construction Leads Nebraska's U.S. 275 Widening

The Nebraska Department of Transportation (NDOT) is overseeing an approximately $38 million project designed to improve reliability, mobility and safety along a stretch of U.S.-275. The U.S.-275 Scribner – West Point segment of the expressway is expanding approximately 18.5 mi....


Graham Construction Takes On Nebraska's Fremont Southeast Beltway

The Nebraska Department of Transportation (NDOT) is overseeing a $62 million project that calls for a four-lane divided expressway on the south side of Fremont in Dodge County. The endeavor coincides with recent increased development in the area....


Nebraska Department of Transportation Awards $83M Contract to Koss

On May 28, the Nebraska Department of Transportation (NDOT) announced the awarding to Koss Construction of Topeka, Kan., for the construction of three segments of U.S. Highway 275 (U.S.-275). The three segments include: Scribner North for $37,772,493; West Point South for $18,546,966; and West Point North and South for $26,894,819....


Paulsen Inc. Begins Work On L-17J Project Near Sidney, Nebraska

Work is under way on L-17J, according to the Nebraska Department of Transportation. Paulsen Inc. , of Cozad, Neb., has the $12,700,000 contract. Work includes grading with soil stabilization; pavement replacement; median surfacing; new storm drains; bridge decking; guardrails; electric work; pavement markings and signs; and earth shouldering with seeding....


NDOT Advances Projects Along Highway 275 Corridor

Highway 275 from Norfolk to Fremont has long been an identified corridor critical to the economic growth of northeast Nebraska and the Nebraska Department of Transportation (NDOT) has recognized this corridor as a priority....







39.96250 \\ -83.00610 \\ Columbus \\ PA