List Your Equipment  /  Dealer Login

Subway Construction Unearths Ancient Road in Greece

Mon July 02, 2012 - National Edition
Costas Kantouris - ASSOCIATED PRESS


THESSALONIKI, Greece (AP) Archaeologists in Greece’s second-largest city have uncovered a 230-ft. (70 m) section of an ancient road built by the Romans that was city’s main travel artery nearly 2,000 years ago.

The marble-paved road was unearthed during excavations for Thessaloniki’s new subway system, which is due to be completed in four years. The road in the northern port city will be raised to be put on permanent display when the metro opens in 2016.

The excavation site was shown to the public on June 25, when details of the permanent display project also were announced. Several of the large marble paving stones were etched with children’s board games, while others were marked by horse-drawn cart wheels.

Also discovered at the site were remains of tools and lamps, as well as the bases of marble columns.

Viki Tzanakouli, an archaeologist working on the project, told The Associated Press the Roman road was about 1,800 years old, while remains of an older road built by the ancient Greeks 500 years earlier were found underneath it.

“We have found roads on top of each other, revealing the city’s history over the centuries,” Tzanakouli said. “The ancient road, and side roads perpendicular to it appear to closely follow modern roads in the city today.”

About 23 ft. (7 m) below ground in the center of the city, the ancient road follows in roughly the same direction as the city’s modern Egnatia Avenue.

The subway works, started in 2006, present a rare opportunity for archaeologists to explore under the densely populated city — but have also caused years of delays for the project.

In 2008, workers on the Thessaloniki metro discovered more than 1,000 graves, some filled with treasure. The graves were of different shapes and sizes, and some contained jewelry, coins or other pieces of art.

A massive excavation project also took place during the 1990s in the capital, Athens, before the city’s new metro system opened in 2000.

Thessaloniki’s new subway is already four years behind schedule, due to the excavation work as well as Greece’s financial crisis. Thirteen stations will operate initially, before a 10-station extension is added later.




Today's top stories

Make Eliminating Jobsite Distractions Company Safety Goal

Two Firms Give Burned Highway New Life

VIDEO: Komatsu Holds Demo Days at Cartersville Customer Center

ABC: Over Half of March State Construction Unemployment Rates Down From a Year Ago

Allen Engineering Hosts 60th Anniversary Celebration

Contractors' Plate Full On Interstate 35 in Texas

Space Coast Leaders, Residents Excited About Planned Brightline Rail Station in Cocoa

Attachments International Debuts Severe Service Demolition Grapple








aggregateequipmentguide-logo agriculturalequipmentguide-logo craneequipmentguide-logo forestryequipmentguide-logo truckandtrailerguide-logo
39.96250 \\ -83.00610 \\ Columbus \\ PA