Create a CEG Account  /  CEG Login

Pennsylvania


Ritzy Laurel Begins With the Pour

The fourth largest mat foundation pour in Philadelphia history took place last month at The Laurel, a $300 million 48-story luxury condo and apartment building under construction. Once complete, the high-rise will be 599 ft....


Reviving the Viaduct — South State Leads Key 15-Span Project in Philly

The Pennsylvania Department of Transportation (PennDOT) is overseeing a nearly $90 million project that will rehabilitate the U.S. 1/Roosevelt Expressway viaduct in Philadelphia. The viaduct is located between the Broad Street and Wissahickon Avenue/Germantown Avenue exits in the Nicetown section of the city....


The Rebirth of H&K's Douglassville Quarry

In early 2019, H&K Group. Inc. (H&K) built a new crushing and processing plant at its Pottstown Trap Rock Douglassville Quarry (PTR-Douglassville Quarry) in Pennsylvania. With help from Kemper Equipment, H&K has built a new state-of-the-art plant, which provides raw materials to H&K's Delaware Valley Asphalt plant in Philadelphia, Pa....


Brady Peat Joins Stephenson Equipment as Western Pa. Trailer Product Specialist

Stephenson Equipment (SEI) has been in the trailer business for generations and represents Rogers and Felling trailers mainly out of its Philadelphia, Pa., branch. When the opportunity became available to become the authorized Rogers dealer of western Pennsylvania as well, SEI was excited to grow this business....


Safety Paves the Way for a Successful 2019 for Schlouch

Schlouch Incorporated's dedication to safety paves the way for its employees to deliver not only a safe but quality, productive, and on time outcome for our clients and project demands. Here is a brief review of some of Schlouch's projects, active or completed, during the summer and fall seasons....


Marona Construction Connects Present to the Past in Philly

Bright white lights shine down on a large, 10-ft. diameter blue pipe that is attached with three chains to a ZX870LC-6. The excavator lifts the pipe up and places it into a 35-ft.-deep trench. It's 4 a.m....


PennDOT Begins Rehabilitation Project for Park Road Bridge

Construction is scheduled to begin Oct. 14, to rehabilitate the bridge carrying Park Road over U.S. 1 (Kennett Oxford Bypass) in West Nottingham Township, Chester County, the Pennsylvania Department of Transportation (PennDOT) announced....


Messick's Christmas Light Show Exceeds $250,000 in Donations

Messick's Christmas Light Show in Elizabethtown, Pa., raised a total of $42,704.56 from 4,352 cars that attended the event. The light show display ran each evening from Dec. 1 through 30 with the help of volunteers who run the show and collect donations for local charities....


Seismic Tour Makes First Stop at Best Line Equipment

Dynapac made its first stop Dec. 19 on its nationwide "Seismic" tour where it shook the ground at Best Line Equipment in State College, Pa., on its way to ConExpo in Las Vegas in March 2020. During the event, guests learned about Dynapac's new Seismic technology using the natural frequency between drum and soil to maximize compaction and energy efficiency....


PennDOT P3 Board Approves I-81 Reconstruction Project

The PennDOT Public-Private Transportation Partnerships (P3) Board approved a proposed P3 project to reconstruct a 4.5-mi. section of I-81 near Wilkes-Barre. The P3 Board originally approved the project in late 2018 as a bundling of 15 bridge replacements along I-80 and I-81 in Luzerne County....





×

Stay Ahead of the Market

Get weekly equipment news, auction updates, and dealer insights — trusted by thousands of industry professionals.



39.96118 \\ -82.99879 \\ Columbus \\ OH \\ US \\ 43215