Create a CEG Account  /  CEG Login

Utah


Stacey and Witbeck Completes $101M Ogden BRT Line

General contractor Stacey and Witbeck recently completed the $101 million Ogden bus rapid transit (BRT) line for the 5.3-mi. transit connection between downtown Ogden and the campuses of Weber State University and McKay-Dee Hospital....


Crews, Officials Celebrate Porter Rockwell Bridge Finish

Construction crews, local officials and the Utah Department of Transportation recently celebrated the completion of the Porter Rockwell Boulevard Bridge, which marked the final segment required to connect Porter Rockwell Boulevard to Redwood Road and 14600 South....


Utah's Bridges Rank First

Utah's bridges are the best maintained in the nation, according to a recent report issued by the U.S. Department of Transportation's Federal Highways Administration (FHWA). Utah has the lowest percentage of bridges on the National Highway System (which includes interstates and other key U.S....


Dish Soap Helps Move Million-Pound Bridge

Crews from Wadsworth Bros. Construction Company used some innovation to execute a bridge slide in Cedar City, Utah. Working with the Utah Department of Transportation, the Draper-based general contractor managed to slide a 1.1-million-lbs....


Officials Want to Reconstruct Popular Dino Tracksite Trail

The Bureau of Land Management (BLM) Moab Field Office (MFO) proposes to rebuild a popular paleontological attraction, the Mill Canyon Dinosaur Tracksite Trail. The BLM proposes to rebuild the trail using safer and more durable materials than those utilized in the original raised wooden boardwalk, which was built in 2014....


Layton, Partners Pour 15 Million Lbs. of Concrete in SLC

Layton Construction recently completed one of the largest continuous concrete pours in Utah state history. Crews from the Sandy-based contractor successfully placed 15.7 million lbs. of concrete in a 13-hour window for a 500,000-sq.-ft....


Construction Crews Turn to Dish Soap to Aid Bridge Slide

The Utah Department of Transportation recently slid a 1.1-million-lb. bridge into place using dish soap to smooth the slide via a hydraulic system. The entire accelerated bridge construction took approximately one year to complete, but the soap-enhanced portion was completed in four hours....


Big-D Construction, Kitchel Finish $1 Billion Prison Project

Work has wrapped up on the new Utah State Correction Facility (USCF), the largest construction project ever undertaken by the state of Utah. The Utah State Prison Relocation project, comprised of 35 buildings and 1.35 million sq....


Sunroc Completes Bluff Street Tunnel Ahead of Schedule

One of St. George's busiest stretches of road is now reopened after construction crews completed a major milestone ahead of schedule. The new pedestrian tunnel running under Bluff Street just south of the Main Street intersection is now accessible to residents after considerable construction was completed....


Approval of Uinta Railway Will Increase Oil Production

The U.S. Forest Service has rejected challenges to the Uinta Basin Railway, saying the project is in the public interest even as it predicts the oil railway could increase climate pollution in the U.S....



Today's Top Stories

  1. Luby Equipment Hosts Open House, Operator Rodeo in Quincy, Ill.  →
  2. Liebherr R 915 Compact G8, R 917 Compact G8, R 920 Compact G8 Excavators Now Available  →
  3. DDC Chooses Apparent Selected Proposer for Design-Build East Side Greenway Connector Project  →
  4. Core Equipment Group Strengthens Leadership Team  →
  5. Atkinson, WSDOT Team Up to Improve Connections Near Puget Sound  →
  6. Yuba Pass Gets Two Bridge Replacements  →
  7. Hyundai Expands Next-Generation Operator Experience to HA30, HA45 Articulated Dump Trucks  →
  8. TxDOT Widens 20 Mi. of U.S. 87 to Improve Safety, Increase Capacity  →
  9. Rep. Frank J. Mrvan Tours Hitachi Global Air Power, Highlights Regional Manufacturing Strength  →
  10. Rebuilding Philadelphia Bridges Amid Buzz  →
  11. Manitou Group Announces Changes in Governance  →
  12. Seabrook Bridge Construction Moves Toward October 2028 Completion  →
  13. Bayfront Park Amphitheater Under Construction in Daphne  →
  14. Mack LR Electric to Begin Production in 2021  →
  15. BNSF Nears Finish Line On $100M Missouri River Bridge Replacement  →
  16. U.S. 90A at S.H. 99 Project in Sugar Land Nears Finish  →
  17. VIDEO: CLM Mobilizes Specialized Excavator for Buccaneer Recovery  →
  18. Lane, Brayman Joint Venture Win $1B ALCOSAN Ohio River Tunnel Contract  →
  19. JESCO Holds 'Pave the Way' Event in South Plainfield, N.J.  →
  20. Liebherr Powers Pulaski Skyway Foundation Project Efficiently  →



×

Stay Ahead of the Market

Get weekly equipment news, auction updates, and dealer insights — trusted by thousands of industry professionals.



39.96118 \\ -82.99879 \\ Columbus \\ OH \\ US \\ 43215