Create a CEG Account  /  CEG Login
☰

TEXAS


USACE OKs $92M Contract for Port of Corpus Christi

The U.S. Army Corps of Engineers (USACE) awarded a $92 million construction contract to Great Lakes Dredge & Dock Company LLC to deepen and widen the Corpus Christi Ship Channel (CCSC) from the Gulf of Mexico to Harbor Island, as part of the Channel Improvement Project (CIP)....


Permian Basin's Latest Boom Requires New Infrastructure

As the United States surge in oil production moves from the Dakotas to Texas, new methods of transport have arisen in order to quickly move the output. In particular, an emerging system known as the Crude Oil Pipeline will transfer the oil directly from Orla, Texas, the seeming epicenter of the boom, to the Port of Corpus Christi for quick export....


USDOT Awards DART $908M Rail Financing Loan

The U.S. Department of Transportation's Build America Bureau provided the Dallas Area Rapid Transit or DART system with a $908 million Railroad Rehabilitation & Improvement Financing or RRIF direct loan on Dec....


El Paso Electric Plans to Add Hundreds of MWs of Solar Energy, Battery Storage By 2023

El Paso Electric (EPE) has identified generation resource additions needed by the 2022-2023 summer peak season. The generation mix includes utility scale solar, battery storage and natural gas. Through initial resource planning studies, EPE determined that it requires additional generating capacity of approximately 50 MW by 2022 and 320 MW by 2023 for a total of 370 MW....


ACCIONA Begins Work on Its Ninth U.S. Wind Farm

ACCIONA Energía has started construction work on its second wind farm in Texas — the company's ninth in the United States — which will increase ACCIONA's United States wind power capacity to 866 megawatts (MW)....


TxDOT Projects in El Paso Ready to Wrap Up in 2019

2018 brought new additions to West El Paso, outlook shifts construction to Central, East El PasoDrivers in West El Paso may be tired of the orange barrels, but come 2019 much of that construction will be wrapping up and new projects will be under way in Central and East El Paso....


CCHB Crew Pours Concrete

Over the past month, crews on the south side of the Harbor Bridge project in Corpus Christi achieved a major milestone with the completion of the largest concrete pour to-date on the project. The pour was part of the construction of the footing for the south pylon and included 3,100 cu....


Focus — 2019 Texas Contractors Be Wary

Texas contractors had a generally strong year in 2018 and can expect a repeat in 2019. However, there are three reasons for caution: rising materials costs, an ever-tightening labor market and increasing interest rates....


Quinbrook Closes on Ranchero Wind Farm Financing

Quinbrook Infrastructure Partners, a specialist investor in low carbon energy infrastructure, announced that its portfolio company, Scout Clean Energy LLC has closed construction financing and tax equity commitments on the 300MW Ranchero Wind Farm located in Crockett County, Texas....


Texas Landowners Fight Kinder Morgan's $2B Pipeline Proposal

FREDERICKSBURG, Texas (AP) — Landowners in Texas Hill Country are scrambling to figure out how to reroute or stop a $2 billion natural gas pipeline proposed by a Houston-based company. Kinder Morgan is surveying the Permian Highway Pipeline's possible route running 430 miles from the Permian Basin oil and gas field in West Texas to a location near Katy, a Houston suburb....





×

Stay Ahead of the Market

Get weekly equipment news, auction updates, and dealer insights — trusted by thousands of industry professionals.